How Long Does a Kitchen Remodel Actually Take in North Texas?

A full kitchen remodel in the DFW metro typically takes 6 to 10 weeks of construction, with the total timeline from first design meeting to finished walkthrough running closer to 3 months once material selection and any needed permitting are factored in.

What Happens Before Demo Starts

Design and material selection, cabinetry, countertops, tile, and fixtures, typically takes two to four weeks. Cabinet lead times through a materials partner like ProSource of Allen can add several more weeks depending on the product line and finish, and that clock doesn't start until every selection is locked in.

What Stretches a North Texas Timeline Specifically

  • Cities across Collin and Rockwall counties each run their own permit review process, timelines vary
  • Custom cabinet orders take longer than in-stock lines
  • Older homes sometimes reveal outdated wiring or plumbing once demo starts, which can add time to get properly inspected

Because Rickey and Kori manage every project personally rather than handing it off between crews, the schedule quoted at the start is the schedule they're accountable for holding, and they'll flag any long-lead item before it becomes a surprise mid-project.